The Nasr Phase II Full Field Development Project - Package 2, involved the installation of a multi-platform super complex integrating a gas treatment platform, a separation platform, an accommodation platform, utilities, flares, and bridges.
It also included the installation of 44km subsea power and 55km infield cables to connect the complex with the existing power generation facilities at Umm Shaif Super-Complex and Das Island. The existing manifold and wellhead towers at Nasr field was also modified.
RAS Markaz project involved the building of the Ras Markaz Oil Storage Terminal, oil storage facility and port near Duqm, as well as a 440-kilometer pipeline from the Oman Main Oil Line to the terminal.
The total capacity of Phase 01 was up to 25 million barrels of crude oil ability to cater for Suezmax and VLCC tankers via Single Point Moorings.